CONSTRUCTION AND INSTALLATION OF SOLAR SYSTEM

Student: Mubaraq Adeola Salau
Supervisor: Dr Abolanle Kafayat Ajibola
HOD: Engr Sakiru Adesokan
Department of Mechanical Engineering
Engineering
The Polytechnic, Ibadan, Oyo State

Abstract

ABSTRACT This report discusses the construction of 3000W monocrystalline solar panel, by determined the energy wattage required at every office in the Department of Mechanical Engineering, and to evaluate the required panel, battery, and inverter which will give the calculation wattage. The basic goal of the installation is to increase the current and voltage to give the required power. Ten panels were connected in series in pairs to increase the voltage and later connected in parallel to increase the current with 16mm connection cable.

Full-Text Access Notice

In accordance with the NERD Policy on promoting peer-reviewed publication, public access to the full text of a project, thesis or dissertation is restricted for three years, allowing the author and supervisors sufficient time to pursue peer-reviewed publication. During this period, researchers with legitimate academic or research purposes may request authorisation directly from the author to enable NERD to release the indexed full texts of the work using the form below.

Request authorisation from the author